货代常用英语句子
以下是货代工作中常用的英语交流句,适用于处理运输、装箱、订舱等情况。
货物准备与船期调整
- When will the cargo be ready? Cargo will be ready at XXX (Jan.28th).(货物将于XXX时间完成)
- Please confirm soonest as possible due to tight space.(仓位紧张,请尽快确认)
- There is no space based on the reply of shipping lines.(船公司回复——没有仓位)
- Adjustment of shipping schedule.(船期调整)
- As requested by customer, cargo cannot catch this voyage and will be postponed to next voyage.(客户要求推至下一航次)
- This shipment can not catch this voyage.(此票货物赶不上这个航次)
出运安排与订舱操作
- Cut off date.(截港时间)
- Documentary off date.(截单时间)
- Empty pick up date (Empty release time).(开仓时间)
- Pre-booking space.(预留仓位)
- Booking had been ordered with shipping lines; however, not receive the confirmation yet.(已向船公司订舱,但未确认仓位)
- Shipment would be combined into one shipment.(几个订单合并一起出运)
- Said 1x20GP is part of below-mentioned shipment.(1x20GP是下面所说货物中的一部分)
- This shipment included the cargo under Order X and Y.(此票货物包含订单号为X和Y的货物)
- We are applying with shipping line for amendment of container size from 1X40HQ into 1X20GP.(申请更改柜型)
- Customer intends to ship remains cargo by LCL.(客户想要通过拼箱方式出运剩余货物)
状态沟通及问题处理
- The latest status.(最新情况)
- No any further information.(没有新消息)
- Original House Bill of lading for this shipment is not surrendered yet, please do not release the cargo to consignee.(此票货物分单还未电放,请勿放货)
- Shipment would be released against telex release; shipper has not presented us the application for telex release, please hold the shipment until our further notice.(签单方式是电放,尚未确认)
- Does this shipment keep on carrying by ZIM LINE or by other shipping lines?(此票货物是否换船公司)
- We are not sure if the customer will accept MSC as carrying line.(不确定客户是否接受MSC)
- Shipper did not agree to show less weight for this shipment.(发货人不同意少显示重量)
- Space (allocation) had been assigned to another customer.(该仓位转给其他客户使用)
- Shipping order will be confirmed tomorrow by shipping lines, we are not sure if the space could be secured now.(明天确定放舱情况)
- It is not solved until now.(事情尚未解决)

