Dekun Energy Crude Storage Depot Was Put into Operation
On September 26, Rizhao Dekun Energy announced to put its crude oil storage depot into operation. The storage depot was the second oil depot owned by Shandong Huaxin Industrial and Trading, with the total storage capacity of 2 million cbm. The other crude oil depot was Hankun Energy Development with the total storage capacity of 2.2 million cbm.
Currently, 0.8 million cbm storage capacity at Dekun Energy has already been put into operation, and the rest will be put into operation soon.
According to SCI’s statistics, after Dekun Energy crude oil storage depot is put into operation, China’s total crude oil storage capacity reaches 268.4558 million cbm.

