|
LOADING RATE (BEAN AND MAIZE)
|
·Fyi the belt at berth is not sufficiently long to load extremes holds without warping along the pier.
Please prepare your loading sequence in such-a-way that # 7 will be loaded up to full before start loading operation into # 1.
This is to avoid more than one warping, and will allow to place the gangway ashore upon vessel´s berthing.
·Along the warping operation the Terminal will be employing all necessary assistance on board and ashore to the vessel, please instruct C. Mate coordinate with Terminal Representative the arrangements.
|