项目背景
Project Background
城市陷 “废弃物困境”,需求迫在眉睫
The City is Trapped in a "Waste Dilemma" with Urgent Demand
克拉斯诺亚尔斯克当前面临的工业废弃物处理难题已十分严峻,具体体现在基础设施缺失与企业困境两大层面:
The current problem of industrial waste disposal faced by Krasnoyarsk is very serious, which is specifically reflected in two aspects: the lack of infrastructure and the dilemma of enterprises:
基础设施严重不足
Severe Lack of Infrastructure
整个城市群无专门的工业废弃物处理场所,现有 “Автоспецбаза” 垃圾填埋场超负荷运行多年,且无现代化分拣系统,按当前速度 2026 年中期将完全填满;文件登记的 “生活垃圾分拣中心” 仅为名义设施,无实际处理能力。
There is no special industrial waste disposal site in the entire urban agglomeration. The existing "Автоспецбаза" landfill has been operating overloaded for many years and has no modern sorting system. According to the current speed, it will be completely filled by the middle of 2026; the "domestic waste sorting center" registered in documents is only a nominal facility and has no actual disposal capacity.
企业与重点项目压力凸显
Increasing Pressure on Enterprises and Key Projects
工业企业被迫在厂区设临时贮存点,占用生产空间且增加环境风险;规划建设 6 个站点的地铁项目,预计产生 150 万吨土方量,急需处理场所;相关企业与项目方频繁发函求助,市场需求已达临界点。
Industrial enterprises are forced to set up temporary storage points in the factory area, which occupies production space and increases environmental risks; the subway project planned to build 6 stations is expected to generate 1.5 million tons of earthwork and is in urgent need of a disposal site; relevant enterprises and project parties frequently send letters for help, and the market demand has reached a critical point.
市场机遇
Market Opportunities
原投资方退出,新入局者 “省时省力”
The Original Investor Withdraws, New Entrants "Save Time and Effort"
原投资方的退出,为新投资者创造了绝佳的市场进入窗口,且前期积累为项目降低了启动门槛:
The withdrawal of the original investor has created an excellent market entry window for new investors, and the early accumulation has lowered the start - up threshold for the project:
前期工作已落地
Early Work Has Been Completed
整个城市群无专门的工业废弃物处理场所,现有
原投资方已完成土地整理、规划设计、审批文件等筹备工作,新投资者可直接承接,大幅节省时间与成本。
The original investor has completed the preparation work such as land consolidation, planning and design, and approval documents. New investors can directly take over, which greatly saves time and costs.
项目方案可优化升级
Project Plan Can Be Optimized and Upgraded
建议在原有基础上,建设两个互补分拣中心 —— 年处理 30 - 40 万吨的工业废弃物分拣中心(填补市场空白)、年处理 50 万吨的生活垃圾分拣中心(构建综合处理体系),最大化土地利用价值。
It is suggested that on the original basis, two complementary sorting centers should be built - an industrial waste sorting center with an annual disposal capacity of 300,000 - 400,000 tons (to fill the market gap) and a domestic waste sorting center with an annual disposal capacity of 500,000 tons (to build a comprehensive disposal system), so as to maximize the land use value.
项目优势
Project Advantages
地块、资源、政策多重加持
Multiple Support from Land, Resources and Policies
项目在地块基础、附加资源、政策支持等方面均具备显著优势,为落地运营提供保障:
The project has significant advantages in terms of land foundation, additional resources and policy support, providing a guarantee for its implementation and operation:
地块与基建扎实
Solid Land and Infrastructure
项目地块(编号 24:04:0000000:16960)上有未竣工的工业废弃物分拣中心,且已完成周边围栏、场地平整、道路底层垫层铺设,10 公顷主体作业区围墙及 30 公顷备用区(含粘土矿区)也已建成。
There is an unfinished industrial waste sorting center on the project land (No. 24:04:0000000:16960). The surrounding fences, site leveling and road base cushion laying have been completed. The 10 - hectare main operation area fence and 30 - hectare backup area (including clay mining area) have also been built.
核心权利随土地转让
Core Rights Transferred with Land
同步转让与俄罗斯电网公司的供电协议、专业设计的项目完整文件、卫生部门批准的卫生防护区项目,简化启动流程,避免重复审批。
The power supply agreement with the Russian power grid company (Россети), the complete project documents with professional design, and the sanitary protection zone project approved by the health department are transferred simultaneously, which simplifies the start - up process and avoids repeated approval.
附加资源创造额外价值
Additional Resources Create Extra Value
地块内有已登记的砖用粘土矿,正洽谈分租协议;粘土可作工程建设材料节省成本,还能用于邻近关闭填埋场的复垦,实现环境与经济双重效益。
There is a registered brick - making clay mine in the land, and a sub - lease agreement is being negotiated; clay can be used as engineering construction materials to save costs, and can also be used for the reclamation of the adjacent closed landfill, realizing dual environmental and economic benefits.
政策纳入重点清单
Included in the Key Project List by Policy
依据 2024 年 10 月 10 日政府令,项目被列入地区重点项目清单,纳入区域规划图,享有政策优先支持,可立即启动审批与建设。
In accordance with the government decree of October 10, 2024, the project has been included in the regional key project list and the regional planning map, enjoying priority policy support, and can start approval and construction immediately.
核心指标
Core Indicators
周期短、成本省、回报稳
Short Cycle, Low Cost and Stable Return
项目关键数据凸显 “低风险、高潜力” 特质,满足长期投资需求:
The key data of the project highlights the characteristics of "low risk and high potential", meeting the long - term investment needs:
建设周期 Construction Cycle
仅需 2 年,从启动到投产速度快;
Only 2 years, with a fast speed from start - up to production;
总投资额 Total Investment
15 亿卢布,规模可控;
1.5 billion rubles, with controllable scale;
已完成资产 Completed Assets
3.5 亿卢布,新投资者可直接承接,节省前期投入;
350 million rubles, which can be directly taken over by new investors, saving early investment;
使用期限 Service Life
设施可无限期使用,保障长期稳定投资回报。
The facilities can be used indefinitely, ensuring long - term and stable investment returns.
当前,克拉斯诺亚尔斯克工业废弃物处理市场 “需求旺、基础实、政策优”,对于寻求跨境投资机会的投资者而言,无疑是不容错过的优质选择。
At present, the Krasnoyarsk industrial waste disposal market has "strong demand, solid foundation and favorable policies", which is undoubtedly a high - quality choice not to be missed for investors seeking cross - border investment opportunities.
如您就上述俄罗斯克拉斯诺亚尔斯克工业废弃物处理项目有意投资或合作,请在本公众号后台留言 “姓名 + 联系方式 + 克拉斯诺亚尔斯克”,以便我们及时与您对接沟通。
If you are interested in investing in or cooperating on the aforementioned Krasnoyarsk Industrial Waste Disposal Project in Russia, please leave a message in the background of this official WeChat account with the format "Name + Contact Information + Krasnoyarsk", so that we can connect and communicate with you in a timely manner.