❶ 先张法:像拉皮筋一样造桥
适用场景:简支板桥(跨径小、梁高矮)
Pre-tensioning method: building bridges like stretching a leather band
Applicable scenario: Simply supported slab bridge (small span, short beam height)
核心逻辑:先拉钢筋,再浇混凝土,靠“黏结力”传递预应力!
Core logic: first pull the reinforcement, then pour the concrete, and rely on the “bond” to transmit the prestressing force!
施工三步曲:
1️⃣搭台拉筋:在预制厂用专用台座固定钢筋,像拉皮筋一样提前张拉;
2️⃣批量生产:一次支模多块桥板,绑钢筋、浇混凝土,效率超高;
3️⃣松手发力:等混凝土硬到75%强度,剪断钢筋,靠回弹力压紧桥板!
Construction three steps:
1️⃣Tabling and stretching: fix the reinforcement in the prefabrication plant with a special pedestal, and tension it in advance like pulling a leather band;
2️⃣Mass production: support the mold of many bridge plates at a time, tie the reinforcement and pour the concrete, the efficiency is super high;
3️⃣ Loosening force: wait for the concrete to harden to 75% strength, cut the rebar, and rely on the rebound force to press the bridge plate!
技术细节:
✔️ 钢筋必须带螺纹,增强与混凝土的“亲密接触”;
✔️ 粗钢筋端部要加钢筋网,防止“内力暴走”撑裂混凝土。
优点:工厂流水线作业,省钱省时!适合标准化小跨径板桥~
Technical details:
✔️ Reinforcing bars must be threaded to enhance “intimate contact” with the concrete;
✔️ The ends of thick reinforcement bars should be reinforced with steel mesh to prevent the “internal force from running out” and cracking the concrete.
Advantages: Factory assembly line operation, saving money and time! Suitable for standardized small-span slab bridges