大数跨境

储能周报 | 300万元!东莞出台储能应用补贴;安徽2023年新增新型储能装机1.37GW

储能周报 | 300万元!东莞出台储能应用补贴;安徽2023年新增新型储能装机1.37GW 雄韬股份
2024-03-19
3


Henan: Cultivate and develop energy storage battery materials and energy storage equipment

On March 14, the General Office of the People's Government of Henan Province issued "Accelerate the manufacturing industry" Six New "breakthrough implementation program of Henan Province". The program proposes to cultivate and grow key strategic materials, including new power and energy storage battery materials. Vigorously develop positive and negative anodes, electrolyte, separator and other metal ion battery materials, layout the development of sodium ion batteries, all(semi) solid state battery industry. Make breakthroughs in the development of key materials for hydrogen fuel cells such as proton exchange membranes, membrane electrodes, catalysts and diffusion layers, and build national hydrogen fuel cell industry base. Focus on the development of crystalline silicon photovoltaic battery materials and compound films. Develop large-size monocrystalline silicon, polycrystalline silicon solar energy materials, poly-Si thin film and others. Research and develop new high-efficiency perovskite battery materials and CIGS and other thin-film battery materials, and create a Silane -St-partiales- Monocrystalline silicon piece- Battery piece-Battery pack-Power stationindustrial chain.

Cultivate and develop strategic and frontier equipment, including energy storage equipment. Strengthen advanced energy storage technology research, focus on the development of large-scale energy storage with lithium-ion batteries, flow batteries, super capacitor energy storage with large capacity and other energy storage equipment. Develop energy storage energy management systems, energy storage converters and other new equipment, and promote the integration and development of distributed utilization technology and energy storage technology. Carry out research on energy storage gradient utilization technology of decommissioned power batteries, comprehensive utilization of new energy and power energy storage system integration technology, research and development of energy storage batteries and systems online testing, state prediction and early warning technology and equipment.


Anhui strives for 15% growth in revenue of advanced PV and new energy storage industry in 2024

On March 11, the Information Office of Peoples Government of Anhui Province held a press conference. The meeting said that in 2023, the new energy storage industry of Anhui Province realized revenue of 80.1 billion yuan, of which 52.8 billion yuan of revenue from energy storage batteries and energy storage system. New new energy storage installed capacity reached 1.37 million kilowatts, the cumulative installed capacity reached 1.78 million kilowatts, increased 334% year on year , ranked and ranked 7th from 9th in China. The number of high-tech enterprises in the field of advanced photovoltaic and new-type energy storage have a net increase of 62, a total of 169, and the number of small and medium-sized high-tech company reached 334.The number of new state-level innovation platforms has increased by 1 with a total number of 6. 12 enterprises with revenues of more than 10 billion yuan have realized combined revenues of 280 billion yuan, of which the revenues of the photovoltaic storage business exceeded 250 billion yuan. The province has 136 new energy storage projects which were signed and under construction, with a total investment of 232.66 billion yuan, an increase of 43.7% year-on-year. 2024, Anhui Province strives to advanced photovoltaic and new energy storage industry revenue growth of 15%, and continue to maintain a leading position in the country.


30GW! Hebei launches 2024 wind power and photovoltaic power generation annual construction

On March 11, Hebei Development and Reform Commission issued a notice on the organization to declare the 2024 wind power and photovoltaic power generation annual development and construction program projects. The Notice states that a total of 30GW of new energy project target scale will be arranged, of which the province intends to arrange a guaranteed grid-connected project scale of 15.97 MKW and a market-based grid-connected project scale of 14.03 MKW. Safeguarded projects should be completed before the end of 2026 full capacity grid, of which northern Hebei and southern power grid areas configure energy storage in accordance with 20%, 2 hours and 15%, 2 hours. Market-oriented grid-connected projects should be completed and connected to the grid at full capacity by the end of 2027.


Huangpu District of Shanghai supports the construction of energy storage facilities such as cold storage tanks and electrical energy storage

On March 8, Huangpu District Development and Reform Commission issued a notice on the issuance of "Carbon Peak Implementation Program of Huangpu District Key Energy Consumption Units ". The program proposes to promote low-carbon transformation of the energy structure, and actively participate in national commercial building demand-side management, energy storage and other demonstration projects. It also promotes the low-carbon development of financial enterprises, and supports the construction of energy storage facilities such as cold storage tanks and electrical energy storage, and regulating power loads according to demand. Formulate different levels of power supply availability and power supply programs, and select low-energy servers, memory and other data processing equipment.


Subsidy of 0.3 Yuan/kWh for discharge capacity! Dongguan City introduces subsidies for energy storage applications and export of energy storage batteries

March 6, Dongguan Development and Reform Bureau issued a announcement for public comment of "The new energy storage battery product export certification funding guidelines of Dongguan City (2024 Revision)", "The new energy storage demonstration application funding guidelines of Dongguan City(2024 Revision)" . Declaration conditions of Battery product export certification funding are as follows: registered in Dongguan City, enterprises specialized in the field of new energy storage related industry R & D production and service; target the European Union, the United States, Japan and South Korea, and other international markets, obtained the export certification for new energy storage battery products for the first time, and conform to front of the meter energy storage, home energy storage, industrial and commercial energy storage, portable energy storage and other application areas. Funding will be provided in accordance with 50% of the certified fees after review and approval, up to a maximum of 1 million yuan.

Declaration conditions of new energy storage demonstration application are as follows: the investment subject of the energy storage demonstration application project registered in Dongguan City, and the implementation of the user-side new energy storage demonstration project in Dongguan City. Since the next month of commissioning, according to the approved actual amount of discharge capacity, the investment subject will be given a subsidy of not more than RMB 0.3/kWh. The cumulative subsidy shall not exceed 2 years, and the cumulative subsidy for a single project shall not exceed 3 million RMB.


Two departments proposes to promote the diversified development of new energy storage

On March 1, the National Development and Reform Commission and the National Energy Administration issued the “Guiding Opinions on the High-Quality Development of Distribution Network in the New Situation”, which proposed to promote the diversified development of new energy storage. Based on the analysis of power system regulation capacity, according to different application scenarios, scientifically arrange the development of new energy storage scale. Guide distributed new energy to reasonably allocate new energy storage according to their own operational needs or by sharing mode, enhance the reliable substitution capability of new energy sources and promote the consumption of new energy sources. Scientifically lay out new energy storage at key nodes of the grid and at the end of the grid, and improve the grid's flexible regulation capability and stable operation level. Support the safe development of user-side energy storage, strengthen metering management. Focus on distributed new energy, charging facilities, big data centers and other end-users, explore new scenarios for the integration of energy storage applications and support participation in grid interaction. Promote the application of long-duration electric energy storage, hydrogen energy storage and thermal (cold) energy storage technology.


Jiangsu: Accelerate grid-side energy storage connect to grid and play the peak role 

Recently, the Development and Reform Commission of Jiangsu Province issued a notice on accelerating the grid-side new energy storage project connect to grid and provide peaking capacity. The document proposes that any grid-side new energy storage project volunteer and ensure to be completed and connected to the grid before July 15, 2024, or policy safeguard project guaranteed supply of electricity for Jiangsu Province, local departments should give strong support to ensure that the project can be built quickly, safely with good benefits. Provincial power dispatching agency shall optimize the regulation strategy and operation mode and give full play to the peak role of the policy-guaranteed grid-side new energy storage projects. In principle, the cumulative discharge call time of four months during summer(winter) peak periods (January, July-August, December) of 2024-2026 should not be less than 320 hours.Strive for two charges and two discharges per day, and the cumulative discharge call time for the remaining eight months should not be less than 320 hours. Strive for one charge and one discharge per day to fully improve the operational efficiency and effectiveness of the policy safeguard program.

·

【声明】内容源于网络
0
0
雄韬股份
1234
内容 904
粉丝 0
雄韬股份 1234
总阅读1.7k
粉丝0
内容904