
Anhui: Revenue of advanced photovoltaic and new energy storage industry strives to reach more than 500 billion yuan by 2025
On April 1, Department of Commerce of Anhui Province issued a notice on strengthening tracking services for advanced photovoltaic and new energy storage production-oriented enterprises. The document mentioned that in 2023, the new energy storage industry in Anhui Province realized revenue of 80.1 billion yuan. The province exported 48.02 billion yuan of photovoltaic and energy storage products, up 28.3%. By 2025, Anhui province strives to achieve a revenue of over 500 billion yuan from advanced photovoltaic and new energy storage industries. Actively explore the export potential of the photovoltaic and energy storage industry, further promote the integration of trade and industry, and increase the proportion of industry revenue overseas. Develop enterprise liaison service program, arrange special person counterparts even liaison. Establish service files for photovoltaic and energy storage enterprises and enrich service contents.
Shaanxi: Strive to reach a total scale of over 2GW of new energy storage connected to grid by 2025
On April 3, Shaanxi Provincial Development and Reform Commission issued “Implementation Program for the Development of New Energy Storage in Shaanxi Province (2024-2025)”, which proposes that by 2025, the new energy storage will enter the stage of large-scale development, the market mechanism, management system and business model will be basically formed, the technological innovation capacity and technical equipment level will be significantly improved, the competitive advantages of the whole industrial chain will be highlighted, and the total scale of new energy storage connected to grid strives to reach more than 2 million kilowatts. The layout emphasizes to guide the key layout of new energy storage in northern Shaanxi, and Kuan-chung Plain north of Wei River. In the 750 kV Xiazhou, Pubai and other power supply area lack of rotational inertia support, explore the development of compressed air energy storage, gravity energy storage and other new energy storage. In "14th Five-Year Plan" period layout 2.6GW new energy storage in 750 kV power supply area such as in Yulin, Yan'an, Weinan, Tongchuan, Baoji, and Xianyang.
Carry out intellectualized reconstruction of energy storage! National Development and Reform Commission supports new energy development in Inner Mongolia
On April 3, National Development and Reform Commission issued “ Several Policy Measures to Support the Green, Low-carbon and High-quality Development of Inner Mongolia”. The measures propose to accelerate the development of new energy industry. Support Inner Mongolia to explore new energy industry innovation development mode, in the premise of guaranteeing consumption, develop wind generator, photovoltaic, photothermal, hydrogen energy, energy storage and other industrial clusters with high quality. Support Inner Mongolia to build a national new energy and advanced high-load energy industries integration development cluster. Promote comprehensive demonstration of smart grid. Build an intelligent power intelligent dispatching system that adapts to a high proportion of new energy and coordinated interaction between power source, power grid and load. Carry out intellectualized reconstruction of operation systems on the grid side, new energy side, energy storage side and user side. Actively develop smart micro-grid new energy as the main body to realize compatibility and complementarity with the power grid. Promote the construction of smart grid demonstration areas in Hohhot, Baotou and Ordos.
Chongqing plans to build more than 2000 supercharger stations,and more than 4000 supercharger piles
On April 3, the General Office of Chongqing Municipal People's Government issued “Chongqing Municipal New Energy Vehicle Convenient Supercharger Action Plan (2024-2025)”. The plan proposes that by the end of 2025, the city will have built more than 2000 supercharger stations, more than 4000 supercharger piles, and the number of charging and energy storage integration stations in the city's new supercharger stations should account for no less than 30%. Accelerate the construction of charging infrastructure network system, carry out pilot projects of smart micro-grid integrating power supply, power grid, load and energy storage with coordinated support from photovoltaic power, energy storage and energy saving, eletric car charging and other facilities. Improve the power grid on the acceptance of clean energy, configuration and regulation capacity. Give full play to the important role of new energy vehicles in the electrochemical energy storage system, promote pilot demonstrations of internet of vehicles, vehicle to grid, integration of power supply, power grid, load and energy storage, and integrated PV and energy storage charging stations, and promote distributed generation, vehicle discharges, and storage power to achievel ocal reactive power.
Wuhan issues carbon peak implementation program, proposes to expand installed scale of new energy storage
On April 7, Wuhan Municipal People's Government issued “Carbon Peak Implementation Program of Wuhan Municipality”. The program proposes to develop non-fossil energy. Promote the development and utilization of solar energy, wind energy, hydrogen energy, geothermal energy, and biomass energy, innovative development of "new energy + energy storage". Construct new power systems. Promote the integrated construction of power grids with "power source, power grid, load and energy storage", strive to build a world-class urban power grid, and increase the proportion of electric energy in end-use energy consumption. Comprehensively promote the construction of smart grids, strengthen demand-side management, and expand the installed scale of new energy storage. Strengthen the research and development of low-carbon, zero-carbon and carbon-negative technologies. Strengthen the research and development of low-carbon, zero-carbon and carbon-negative technologies. Promote research on low-carbon technologies such as wind, PV, fire, storage and multi-energy complementation, intelligent scheduling and control of power grids, fuel cells and intelligent construction.
Energy storage strives to reach 1.1 GW by 2030! Jieyang City issues energy storage development plan
On April 8, Jieyang Municipal Development and Reform Bureau issued "Energy Storage Development Plan (2023-2030) of Jieyang City". The plan specifies the development direction and goals of energy storage in Jieyang City, striving to reach 300,000 kilowatts, 600,000 kilowatts and 1.1 million kilowatts of new energy storage power plant scale by 2025, 2027 and 2030, respectively. The plan has both the planning of energy storage projects and the layout of energy storage industry development. On the one hand, combined with the development foundation of Jieyang, plan and layout a new energy storage power station of 1.1 million kilowatts by 2030, and promote the construction of pumped storage projects. On the other hand, use projects to drive the industry, plan and layout hydrogen energy and energy storage industry, and strive to cultivate new energy storage industry to become a new growth point in the manufacturing industry in Jieyang City.
A total investment of 6 billion yuan! Pingdingshan plans to build 10 new energy storage projects
On April 9, Pingdingshan Municipal People's Government Office issued opinions of accelerating the implementation of the energy structure adjustment. Opinions proposed to accelerate the construction of new energy storage base. Strive for energy storage projects in the source network load side application scenarios scale and diversification. Strive for large-scale and diversified application scenarios of energy storage projects on power supply-power grid-load side. Take China PingMei ShenMa Group, Pinggao Group, Pingfa Group as the leader to expand energy storage materials and battery industry, improve the energy storage industry chain upstream and downstream supporting, use key projects to drive the development of energy storage industry. Pingdingshan intends to build 10 new energy storage projects, with a total scale of about 1.2 million kilowatts, a total investment of more than 6 billion yuan, and a grid-connected scale of more than 1 million kilowatts in 2025. Specific work initiatives include: actively promote the reform of incremental distribution business, accelerating the construction of source network and storage integration projects. Construct a national experimental platform of wind,PV and energy storage (Pingdingshan base).

